| |
1 |
2 |
3 |
4 |
SCORE |
|---|---|---|---|---|---|
| Team work |
Members struggled to work together and 3 or more parts of the project were not completed in the time allotted. |
Members of the group had some difficulty working together and 2 parts of the project were not completed in the time allotted. |
Most members of the group worked together to make sure the parts of the project were completed in the time allotted – 1 part missing. |
All members of the group worked well together and completed 3 charts, menu, poster and script in the time allotted. |
|
| Math Content with charts and data |
The team produced 1 type of chart and data was analyzed correctly. |
The team produced 2 different types of charts and data was analyzed correctly. |
The team produced 3 different types of charts and data was analyzed with minor errors. |
The team produced 3 different types of charts and data was analyzed correctly. |
|
| Floor Plan – Math Content |
Floor plan lacked the required elements. There were errors in determining the area and perimeter. |
Floor plan included some of the required elements. There were errors in determining the area and perimeter. |
Floor plan included most of the required elements and the area and perimeter were correct. |
Floor plan included all required elements and the area and perimeter were correct. |
|
| Menu |
Menu was not organized and difficult to follow. |
Menu was organized but difficult to follow. |
Menu was organized and had graphics. |
Menu was organized, easy to follow and included meaningful graphics. |
|
| Podcast Script |
Script had many grammar or spelling mistakes. |
Script had some grammar or spelling mistakes. |
Script had minor grammar or spelling mistakes. |
Script had no grammar or spelling mistakes. |
|
| TOTAL SCORE |
|
||||